Clements Contractors Ltd with their Keestrack R5 Impact Crusher and S5 Tracked Stacker for their Western Hills Quarry in Whangarei. Processing blue and brown greywacke face rock, the R5 churns through it to produce a range of products for the quarry from a GAP20 to a Sub 150 and everything in between. All possible thanks to the R5's built-in pre-screen, massive 5-tonne rotor with a 10:1 reduction ratio and double-deck after-screen. The S5 Tracked Stacker moves the material away as fast as you can make it, reducing loader movements and making piles as big as 2,500 tonnes!
To be honest, we don’t do much outbound marketing. So if you give us your email, we’re unlikely to spam you.